Skip to main content

krait minerals

U.S. Critical Minerals Exploration

Nevada Antimony Project

Past-producing antimony property in Humboldt County, Nevada

KRAIT Critical Minerals has entered into an exclusive option agreement to acquire a 100% interest in a road-accessible property with documented historical antimony production and mineral workings.

Acquisition status: exclusive option agreement announced October 21, 2026. Historical results are unverified; the property is not in production.

17

Mining claims

Contiguous unpatented federal claims

≈354

Acres

Approximate claim area

2.25 km

Historic workings trend

Reported extent of workings, not a proven mineralized length

100%*

Interest under option

Exclusive option to acquire, not completed ownership

* Subject to the cash payments, share issuances, royalty and other conditions under the option agreement.

Project Overview

A past-producing Nevada antimony property

On October 21, 2026, KRAIT announced that it had entered into an agreement with Sierra Antimony Corp. granting an exclusive option to acquire a 100% interest in 17 contiguous unpatented federal mining claims covering approximately 354 acres in Humboldt County, Nevada.

The property has documented historical antimony shipments dating from 1927 through 1942 and a record of trenching, shafts, adits and other workings. It complements KRAIT’s antimony interests in Washington State while the Goldbar Spider Lake Project remains the company’s flagship asset in Ontario.

Illustrative Nevada landscape. Not a photograph of KRAIT's mineral claims.
Regional locator placeholder — not a surveyed map or claim-boundary depiction. Replace with approved GIS mapping when available.

Location & Property

Humboldt County, Nevada

The project comprises 17 contiguous unpatented federal claims in Humboldt County. The October 21 news release describes the property as road-accessible, approximately four hours north of Reno, Nevada.

Jurisdiction

Humboldt County, Nevada, USA

Jurisdiction

17 contiguous federal mining claims

Size

Approximately 354 acres

Acquisition status

Exclusive option to acquire 100%

Portfolio Context

Expanding KRAIT's U.S. antimony interests

The Nevada option agreement complements the company’s existing Washington State antimony exploration interests and reflects its strategy of evaluating mineral opportunities across North America.

Nevada, USA

Historical production

Reported antimony shipments and underground workings provide historical data for evaluation; their reliability and relevance to remaining mineralization require verification.

Washington, USA

Existing antimony interests

KRAIT’s Washington State interests include Bales Antimony, Antimony Bell and related assets through Nevada Hills Antimony LLC.

Ontario, Canada

Flagship gold project

Goldbar Spider Lake remains KRAIT’s flagship exploration asset, alongside the company’s evaluation of additional North American opportunities.

Geological Setting

Historically reported stibnite-bearing quartz veins

Historical descriptions of the Nevada King Mine reference stibnite mineralization in shear-associated quartz veins within a metasedimentary rock package. Some quartz veins were historically traced for more than 3,000 feet.

Historical descriptions report vein mineralization occurring as narrow pods and lenses, locally to approximately two feet wide, with lower-grade disseminated material in altered host rock. These observations have not been verified through modern fieldwork.

Conceptual stibnite and quartz mineral illustration — not a sampled specimen from the Nevada Antimony Project.

Exploration History

Documented historical antimony shipments, 1927–1942

Government records cited in the company’s October 21, 2026 news release describe selectively mined, high-grade historical shipments. These production grades do not represent property-wide or in-situ mineralization.

Year Reported ore shipped Reported antimony grade (Sb)
1927 30 tons 50%
1941 5 tons 41%
1942 2 tons 54%
1942 Additional 5 tons Not reported

Source: Edmond F. Lawrence, Antimony Deposits of Nevada (1963), Bulletin 61, p. 80, as cited in KRAIT’s October 21, 2026 news release. Historical figures are unverified and should not be treated as an estimate of remaining mineralization.

Historical information: These were selective high-grade shipments, not a current mineral resource, reserve, grade estimate or evidence of economically recoverable mineralization. Historical production information has not been independently verified by the company’s Qualified Person.

Historical Technical Records

Historic workings and reported sampling

Recorded historical workings

The Nevada King Mine is described in historical government publications as having four adits, two shafts and open cuts, with workings along a reported 2.25-kilometre trend.
  • Approximately 300 linear feet of shaft workings
  • Approximately 210 linear feet of drifts and crosscuts
  • Approximately 25 linear feet of tunnels or adits, plus open cuts
  • Trenching, adits and stope work historically dating to the First World War period

Historical chip-sampling results

Historical government records include analytical results for antimony and several other elements. These are not results from a current KRAIT sampling program.
  • 17 samples: 10.6–9,800 ppm antimony (Sb)
  • 11 samples: 0.003–0.718 ppm gold (Au)
  • 11 samples: 0.36–8.3 ppm silver (Ag)
  • Reported molybdenum (Mo) values up to 50 ppm

Figures from historical publications and archival records referenced in the October 21 news release. Sampling locations, widths, original certificates and quality-control information are incomplete or unavailable. The property is not currently in production and has no reported buildings, equipment or on-site power infrastructure.

Transaction Overview

Option to acquire a 100% interest

Under the option agreement dated October 19, 2026, KRAIT may acquire a 100% interest in the property by satisfying the stipulated cash payments and share issuances, subject to the royalty and applicable requirements. The option agreement should not be described as a completed acquisition.

US$75,000

Total cash consideration

Staged payments of US$5,000, US$20,000 and two payments of US$25,000 over the stated option period.

150,000 shares

Initial share issuance

Plus shares valued at CAD$200,000 on each of the first and second anniversaries, calculated under the agreement’s pricing provisions.

2.5% NSR

Royalty provision

Royalty commencing upon commercial production, with a right to reduce it to 1.0% through a US$2 million payment.

Agreement status and terms are presented as announced October 21, 2026. The agreement includes regulatory conditions, permits acceleration of payments and does not prescribe a minimum exploration expenditure requirement to exercise the option. Consult the full announcement for complete information.

Planned Evaluation

A disciplined technical review

KRAIT expects to begin by reviewing available geological and technical records to identify areas meriting further investigation. Additional activities would depend on results, access, permitting, technical evaluation and management approval.

01

Historic data review

Compile and assess the available published geological, production and sampling records.

02

Prospective-area review

Evaluate reported structures and workings to identify questions for possible field investigation.

03

Potential field methods

Mapping, prospecting, geochemical sampling or geophysical surveys may be considered, subject to approval.

04

Further evaluation

Assess findings and determine whether additional exploration activities are warranted.

Program status: This graphic illustrates a possible evaluation sequence, not an authorized phased program, drilling commitment, budget or timetable. All future activities remain subject to the conditions described above.

Technical Disclosure

Historical information and source notes

Historical information limitations

Reported historical production, grades, geologic observations and sampling are derived from older government records. They have not been independently confirmed by KRAIT’s Qualified Person through site inspection, resampling or independent laboratory analysis. Historical shipment grades refer to selectively mined material and are not indicative of the grade or quantity of mineralization remaining in place.
Available historical information lacks complete original sampling locations, widths, protocols, assay certificates, laboratory details and QA/QC records. No current mineral resources or mineral reserves have been defined for the property. There is no assurance that further work will identify economically significant mineralization.

Qualified Person and forward-looking information

The scientific and technical content of the October 21, 2026 news release was reviewed and approved by J. Garry Clark, P.Geo. (PGO #0245), a director of KRAIT and a Qualified Person under NI 43-101. This statement does not imply his approval of this separately drafted web page; the final web page requires appropriate independent technical and editorial approval.

Statements about option exercise, technical evaluation, potential fieldwork and exploration outcomes are forward-looking and subject to conditions, financing, access, permitting and other uncertainties. Readers should refer to KRAIT’s complete October 21 announcement and applicable continuous disclosure.

Principal historical references

  1. Lawrence, Edmond F. (1963). Antimony Deposits of Nevada, Bulletin 61, p. 80.
  2. Bergquist, J.R., Plouff, D., Turrin, B.D., Smith, J.G., Turner, R.L., and Willett, S.L. (1987). Mineral Resources of the Blue Lakes Wilderness Study Area, Humboldt County, Nevada. U.S. Geological Survey Bulletin 1726-D.
  3. U.S. Bureau of Mines (March 1988). Western Field Operations Center, Record ID 0320130236.
  4. KRAIT Critical Minerals news release, October 21, 2026 (source of reported transaction terms and cited historical information).

Principal Historical Sources

Get in Touch

Want to Speak With the KRAIT Team?

Contact KRAIT Critical Minerals Corp. with questions about the Company, the Bales Antimony Project or KRAIT’s broader critical-minerals strategy.