Skip to main content

krait minerals

U.S. Critical Minerals Exploration

Dixon Tungsten–Manganese Project

Historic tungsten–manganese prospect near Carson City, Nevada

KRAIT Critical Minerals has entered into an option agreement granting it an exclusive option to acquire a 100% interest in six contiguous unpatented federal lode mining claims approximately 13 kilometres (8 miles) east of Carson City, Nevada, covering a prospect investigated by the United States Geological Survey (USGS) in the early 1940s.

Acquisition status: exclusive option agreement announced November 3, 2026. Historical results are unverified by KRAIT’s Qualified Person; no current mineral resources or mineral reserves have been established.

6

Lode claims

Contiguous unpatented federal claims, DXT 1–6

≈13 km

East of Carson City

Approximately 8 miles, Hackett Canyon–Fiddlers Green area

1943

USGS examination

Historical mapping, sampling and two underground adits recorded

100%*

Interest under option

Exclusive option, not completed ownership

*Subject to aggregate cash payments of US$120,000, Cannon Bridge Mining Services Inc. exercising its underlying option from Stream Metals LLC, and a 2.0% NSR royalty. See Transaction Overview below.

Project Overview

A historically documented tungsten–manganese prospect

On November 3, 2026, KRAIT announced that it had entered into an agreement with Cannon Bridge Mining Services Inc. granting it an exclusive option to acquire a 100% interest in the historic Dixon Tungsten–Manganese Project, comprising six contiguous unpatented federal lode mining claims east of Carson City, Nevada.

The proposed acquisition would expand KRAIT’s North American exploration portfolio into tungsten and manganese. Government records describe tungsten-bearing manganese oxide mineralization in altered rhyolitic rocks, historical sampling and two underground exploration adits.

Historical information: All historical results are unverified by KRAIT’s Qualified Person, may not be representative of the Property, and do not establish current mineral resources or mineral reserves.

Figure 1: Dixon Project regional location map, showing the six claims east of Carson City and selected historical Nevada tungsten properties. Locations approximate.
Figure 2: Dixon DXT 1–6 claim boundary and approximate location of the historically documented prospect and two underground adits. Locations approximate.

Location & Property

Hackett Canyon–Fiddlers Green, Nevada

The Dixon Project comprises the DXT 1–6 claims in the Hackett Canyon–Fiddlers Green area of western Nevada. The prospect is referenced in historical geological publications and USGS Mineral Resources Data System (MRDS) records 10043765 and 10296288, which provide historical identification of the Dixon prospect.[5]

Existing roads and tracks provide access to the general area, but their suitability for future exploration remains to be assessed.

Jurisdiction

Western Nevada, USA

Claims

Six contiguous unpatented federal lode claims (DXT 1–6)

Commodities

Tungsten and manganese

Acquisition status

Exclusive option to acquire 100%

Portfolio Context

Expanding KRAIT's North American critical minerals portfolio

The proposed acquisition would add tungsten and manganese to KRAIT’s existing gold and antimony interests in Ontario, Washington State and Nevada.

Nevada, USA

Tungsten–manganese

The Dixon Project: a historically documented prospect east of Carson City, under an exclusive option to acquire a 100% interest.

Nevada, USA

Option agreement with Sierra Antimony Corp. to acquire a 100% interest in 17 contiguous unpatented claims (approximately 354 acres) in Humboldt County.

Washington, USA

Interests relating to the Bales Antimony and Antimony Bell projects, held through Nevada Hills Antimony LLC.

Ontario, Canada

Goldbar Spider Lake: option to earn a 100% interest in a 3,636-hectare property in the western Schreiber–Hemlo Greenstone Belt.

Geological Setting

Tungsten-bearing manganese oxides in silicified rhyolitic rocks

Originally explored for manganese in the 1930s and early 1940s, the Dixon prospect was subsequently investigated for tungsten associated with manganese oxide mineralization. In 1943, USGS geologists M.R. Klepper and P. Joralemon mapped and sampled tungsten-bearing manganese oxide mineralization within locally brecciated, intensely silicified rhyolitic volcanic rocks.[1][2]

The investigators also suggested that mineralization in the lower workings could be structurally displaced from the surface zone. These unverified interpretations require modern mapping and sampling.[1]

Figure 3: Geological map showing the Dixon DXT 1–6 claims, principal rock units, mapped faults and nearby historical occurrences. Locations approximate.

Exploration History

Historical USGS tungsten and manganese sampling, 1943

Two historical USGS samples reportedly returned the following results. The limited sample results do not represent average Property grades.

Historical sample Tungsten trioxide (WO3) Manganese oxide (MnO)
Sample 1 0.21% 11.57%
Sample 2 0.39% 24.78%

Source: Historical USGS and Nevada Bureau of Mines and Geology records.[1][4] Historical descriptions also report a chip sample across approximately 13 feet (4.0 metres) in the lower crosscut, with a historically corrected width of about 10 feet (3.0 metres), and a chip sample across approximately 24 feet (7.3 metres) in the upper crosscut, with a historically corrected width of about 17 feet (5.2 metres).[1]

Historical information: Historical sample locations, methods and widths have not been independently verified; the corrected widths are not confirmed true widths. The limited sample results do not represent average Property grades. MnO analytical values should not be confused with elemental manganese (Mn) grades.

Historical Technical Records

Historic workings and mineralized material descriptions

Recorded historical workings

Historical records describe two underground exploration crosscuts at the prospect:[1]

  • Lower crosscut approximately 120 feet (36.6 metres) long
  • Upper crosscut approximately 40 feet (12.2 metres) long
  • Upper crosscut about 35 feet (10.7 metres) above the lower

Historical mineralized material descriptions

A 1943 government investigation described approximately 1,000 tons of material between the upper adit and surface containing an estimated minimum of 10% tungsten-bearing manganese oxides. The same investigation suggested approximately 250 additional tons of material above the lower adit containing about 20% oxide material.[1]

These historical percentages refer to estimated tungsten-bearing manganese oxide material, not WO3 or elemental Mn grades.

The tonnage descriptions predate National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and are provided solely as historical exploration information, not as current mineral resources or mineral reserves.

Original estimation methods, geological supporting data, density assumptions, classification criteria and verification procedures are insufficiently documented for assessment under modern reporting standards. A Qualified Person has not done sufficient work to classify these historical estimates as current mineral resources or mineral reserves, and KRAIT is not treating them as such. Investors should not rely on the figures as evidence of current mineral quantity, grade or economic recoverability. No current resources or reserves have been established at Dixon.

Rock exposure in the project area. From HMK Mining project materials; date, photographer and precise location not verified.
Opening in rock described in project materials as a historical working. From HMK Mining project materials; not verified by KRAIT.

Photographs are from third-party project materials and were not taken by KRAIT. KRAIT’s Qualified Person has not visited the Property. The date, photographer and precise location of each photograph have not been verified, and the photographs are not evidence of mineralization, grade or the condition or safety of any historical workings.

Transaction Overview

Option to acquire a 100% interest

Cannon Bridge Mining Services Inc. (“Cannon Bridge”) has granted KRAIT an exclusive option to earn and acquire a 100% ownership interest in the Property. Cannon Bridge holds an underlying option from Stream Metals LLC (“Stream Metals”) to acquire the Property and must exercise that option before or concurrently with KRAIT’s acquisition of title. The option should not be described as a completed acquisition.

US$120,000

Total cash consideration

Six staged payments to Cannon Bridge between December 22, 2026 and March 22, 2029. Each payment is non-refundable when made, and outstanding amounts may be prepaid without penalty.

2.0% NSR

Royalty provision

Payable to Cannon Bridge or its permitted assigns upon vesting. KRAIT has a one-time right to repurchase 1.5% for US$1,000,000 in cash, leaving an unreducible 0.5% NSR.

Underlying option

Stream Metals LLC

Cannon Bridge must exercise its underlying option from Stream Metals before or concurrently with KRAIT’s acquisition of title.
Payment due Amount (US$)
December 22, 2026 10,000
March 22, 2027 10,000
September 22, 2027 25,000
March 22, 2028 25,000
September 22, 2028 25,000
March 22, 2029 25,000
Total 120,000

Agreement status and terms are presented as announced November 3, 2026. If KRAIT misses a payment, Cannon Bridge must give written notice and a 30-day opportunity to cure before it may terminate the option, subject to the Agreement’s force majeure provisions. The transaction remains subject to the Agreement’s terms, applicable law and relevant Canadian Securities Exchange policies. Consult the full announcement for complete information.

Planned Evaluation

A disciplined technical review

KRAIT expects to review available geological information before determining whether mapping, prospecting, geochemical sampling or geophysical surveys are warranted. Any fieldwork will be subject to technical assessment, access, permitting and management approval.

01

Historical data review

Review available geological information, government records and historical sampling descriptions.

02

Field-method assessment

Determine whether mapping, prospecting, geochemical sampling or geophysical surveys are warranted.

03

Approvals

Any fieldwork will be subject to technical assessment, access, permitting and management approval.

04

Further updates

Further updates will be provided as appropriate.

Program status: This sequence illustrates the review described in the November 3, 2026 news release. It is not an authorized exploration program, budget or timetable.

Technical Disclosure

Historical information and source notes

Historical information limitations

Historical geology, sampling, widths and mineralized-material descriptions were compiled from government records and technical publications and have not been substantiated by modern exploration. They provide context only and should not be taken as evidence of current resources, reserves or economic viability.

Missing original sample locations, assay certificates, sampling procedures, laboratory and QA/QC records limit the reliability of the historical data. No current mineral resources or mineral reserves exist at the Project, and there is no assurance that the acquisition will close, exploration will succeed, or future work will establish an economic mineral deposit.

Qualified Person and forward-looking information

The scientific and technical information in KRAIT’s November 3, 2026 news release was reviewed and approved by J. Garry Clark, P.Geo. (PGO #0245), a director of KRAIT and a “Qualified Person” as defined by NI 43-101. Mr. Clark has not visited the Property or independently verified historical sampling, analytical, production or shipment information through fieldwork or laboratory work; his review relied on the cited maps, publications and databases.

Statements about the proposed acquisition, option payments, Cannon Bridge’s underlying option, vesting and title transfer, the royalty buyback, review of historical information and potential exploration are forward-looking and subject to risks including title, access, permitting, financing and the reliability of historical records. Readers should not place undue reliance on forward-looking information and should consult the complete November 3 announcement and KRAIT’s filings on SEDAR+.

Principal historical references

  1. Bateman, P.C., and Klepper, M.R. (1943–1944). Ormsby County – Dixon Brothers. Nevada Bureau of Mines and Geology, Mining District Files, Record 13900010.
  2. Klepper, M.R., and Joralemon, P. (1943). Geologic Map of Dixon Brothers Manganese-Tungsten Prospect. Nevada Bureau of Mines and Geology, Mining District Files, Record 13900019.
  3. Moore, J.G. (1969). Geology and Mineral Resources of Lyon, Douglas, and Ormsby Counties, Nevada. Nevada Bureau of Mines and Geology, Bulletin 75, p. 31.
  4. Stager, H.K., and Tingley, J.V. (1988). Tungsten Deposits in Nevada. Nevada Bureau of Mines and Geology, Bulletin 105, pp. 30–31.
  5. United States Geological Survey, Mineral Resources Data System (MRDS), Records 10043765 and 10296288.
  6. KRAIT Critical Minerals news release, November 3, 2026 (source of reported transaction terms and cited historical information).

Principal Historical Sources

Get in Touch

Want to Speak With the KRAIT Team?

Contact KRAIT Critical Minerals Corp. with questions about the Company or the Dixon Tungsten–Manganese Project.